• Signing of framework agreement between REE, RTE and Inelfe. 2009. From left to right: Carlos Collantes (Inelfe's President), Philippe de Fontaine-Vive (EIB's Vice President) and Teresa Quirós (REE's Finance Director) 1 / 20 − Signing of framework agreement between REE, RTE and Inelfe. 2009. From left to right: Carlos Collantes (Inelfe’s President), Philippe de Fontaine-Vive (EIB’s Vice President) and Teresa Quirós (REE’s Finance Director)
  • Signing of loan agreement with the European Bank of Investment (EIB). From left to right: Carlos Collantes (Inelfe's President), Philippe de Fontaine-Vive (EIB's Vice President) and Teresa Quirós (REE's Finance Director) 2 / 20 − Signing of loan agreement with the European Bank of Investment (EIB). From left to right: Carlos Collantes (Inelfe’s President), Philippe de Fontaine-Vive (EIB’s Vice President) and Teresa Quirós (REE’s Finance Director)
  • Archaeological field surveys, which have to be carried out before work can commence. 3 / 20 − Archaeological field surveys, which have to be carried out before work can commence.
  • Underground trench. 4 / 20 − Underground trench.
  • Construction of converter station at Santa Llogaia. 5 / 20 − Construction of converter station at Santa Llogaia.
  • Construction of converter station's warehouse at Baixas. 6 / 20 − Construction of converter station’s warehouse at Baixas.
  • Transportation by road of one of the transformers. 7 / 20 − Transportation by road of one of the transformers.
  • Converter station at Santa Llogaia. 8 / 20 − Converter station at Santa Llogaia.
  • Converter station at Baixas. 9 / 20 − Converter station at Baixas.
  • Laying the cables in the trenches. 10 / 20 − Laying the cables in the trenches.
  • Close-up of the cable. 11 / 20 − Close-up of the cable.
  • Inaguration of the Canigó tunnelling machine 12 / 20 − Inaguration of the Canigó tunnelling machine
  • Alberas tunnelling machine. 13 / 20 − Alberas tunnelling machine.
  • One of the tunnelling machines inside the tunnel. 14 / 20 − One of the tunnelling machines inside the tunnel.
  • Work in the tunnel at La Junquera. 15 / 20 − Work in the tunnel at La Junquera.
  • The tunnelling machine completes the tunnel excavation. 16 / 20 − The tunnelling machine completes the tunnel excavation.
  • Completed tunnel. 17 / 20 − Completed tunnel.
  • Assembly of cables inside the tunnel. 18 / 20 − Assembly of cables inside the tunnel.
  • The tunnel with the cables already laid. 19 / 20 − The tunnel with the cables already laid.
  • Europe at night 20 / 20 − Europe at night